Costs and margins

The real cost of every work order

Bold calculates manufacturing cost from the materials actually consumed and the times actually recorded on the shop floor, not from estimates. You know which orders and products use more resources than planned.

Without shop-floor data, cost is an estimate

The costing is theoretical

Cost is calculated from standard times and consumption that nobody checks against what happens on the shop floor.

Deviations show up at month end

By the time the books are closed, nobody knows which order overran or why.

Some costs are never allocated

Breakdowns, spare parts and maintenance hours are rarely assigned to the machine that causes them.

Shop-floor record of times and consumption for an order

A cost calculated from what happened

Bold derives manufacturing cost from the materials consumed and the times recorded on the shop floor, and relates it to what was actually executed.

You spot deviations and understand which orders or products require more resources than expected.

Cost breakdown of a maintenance intervention

Maintenance has a cost too

Bold combines recorded hours with the technician's cost, and spare parts consumed with their real cost per lot. You know the labour, materials and total cost of every intervention.

With each asset's history you can decide with numbers whether it is worth continuing to repair a machine.

Inventory valuation by location

How much capital sits in your warehouse

View the monetary value of your stock as well as its quantities. Valuation connects stock with its costs.

With dashboards and reports you can analyse that data and track how it evolves.

Frequently asked questions

Stop estimating what manufacturing costs

Tell us how you calculate your costs today. We'll show you how Bold derives them from what happens on the shop floor, order by order. Costs from shop-floor data.

  • Real cost per order
  • Deviations in plain sight
  • Maintenance allocated
Know your costs

A demo focused on your costs