Articles

Every week we talk about industry, digitalisation, economics and entrepreneurship.

Article cover image
2026-10-08

What Is a CMMS, and Should You Measure by Time or Usage?

A CMMS doesn’t prevent breakdowns: it prevents you from forgetting the inspections you had already decided to do. And what determines when an inspection is due is almost never a date; it’s a usage counter your plant is already tracking in another system.

Illustration of orders organized into waves
2026-10-06

Wave picking: what it is and how to implement it in your warehouse

Discover how wave picking groups orders into batches to reduce travel and synchronize preparation; a practical guide to implementing it.

Representation of design and validation on mobile devices
2026-09-29

Mobile interface for operators: what it should include and how to validate it on the factory floor

Design and validate a mobile interface for operators that prioritizes tasks, works with gloves, and syncs offline; includes metrics.

Article cover image
2026-09-24

What Is an MRP: Why the Calculation Is the Easy Part

An MRP calculates what to buy, what to make, and when. The arithmetic fits on a napkin. What determines whether you can sign off on the plan are three pieces of data that almost no factory keeps up to date.

Isometric illustration about warehouse traceability
2026-09-15

Barcodes in the Warehouse: A Practical Guide for Industrial SMEs

Warehouse barcodes help reduce errors, speed up inventory counts, and track batches; discover how to implement them in your SME.

Article cover image
2026-09-10

Lot Traceability: Why Complying with the Law Isn’t Enough to Recall a Product

Regulations require you to know who you buy from and who you sell to. The link that actually determines a recall—what raw material lot ended up in which product lot—is one you have to build yourself.

Isometric illustration of cloud MRP planning
2026-09-08

Leave Excel Behind in 4–6 Weeks: Cloud MRP for Industrial SMEs

A guide for production managers: implement a cloud MRP in 4–6 weeks, integrate ERP/MES/WMS, measure results, and comply with GDPR.

Isometric illustration of MRP and ERP
2026-09-01

Decide in 30 Days Whether Your Industrial SME Needs MRP or ERP

For production managers: an operational checklist, thresholds for choosing MRP, ERP, or MES, and a practical case with rapid implementation in 30 days.

Article cover image
2026-08-27

How ERPs Conquered the World (and Why You Don’t Need a “Manufacturing ERP”)

ERP was born in the factory, left it to conquer the office, and is now trying to sell you production as just another module, an add-on. In this post, I’ll explain why your plant needs something else.

Isometric illustration about production KPIs
2026-08-11

Production KPIs: What to Measure First and How to Avoid Common Mistakes

Prioritize metrics that drive decisions: start with OEE, cycle time, downtime, and first-pass yield; agree on a data dictionary and owners.